San Mateo Bridge Widening Project| Phase IV • Pre-cast Concrete Pilings Preparation & Coating Application |
| Phase V • Site Photos of Loaded Barges & Installation of Deck Plates |
San Mateo Bridge Site San Francisco BayBarges ted up along side of the bridge waiting to have pilings, end caps, girders and deck plates removed. |
Concrete Finishing Of Bridge Deck & Underside Of DeckFinal stage of concrete finishing over coated deck plates and girders. While all the primary coating takes place in the pre-cast yard, some additional coating is required at the job site. A different coating contractor is responsible for all on site touch up and repairs.
|
![]() |
Girder & Deck Plate Installation / Concrete Pumping LEFT: Layout of deck plates and initial concrete topping between deck plates. Concrete is applied through a pump truck, directly over deck plates and re-bar. RIGHT: This photo shows how a girder is installed and tied in with re-bar. |
![]() |

Completion of a segment of the CALTRANS San Mateo Bridge widening project.